Electrical Projects

I have over 10 years experience in design and manufacturing of MV & LV switchgear, estimation, coordination, site supervision of projects.
My technical strengths include MV & LV switchgears, switchboard, MCCs, schematic design, protection and control system and project management.
I have delivered project with total amount of 25 Million USD.
Here are some of the projects which I was involved in their power distribution field.


download

South Pars Gas Field

Development Phases 19

naft naft naft naft Status: In-hand

Owner: Pars Oil & Gas Company (POGC)
Contractor: Petro Pars Iran (PPI)
Consulting: Nargan Engineering
Location: Assaluye, Iran
Vendor: Parstableau
My Position: Project Manager
My Task: Supplying Bus duct & LV Switchgear

The South Pars field is a natural gas condensate field located in the Persian Gulf. It is the world's largest gas field, shared between Iran and Qatar. According to the International Energy Agency (IEA), the field holds an estimated 1,800 trillion cubic feet (51 trillion cubic metres) of in-situ natural gas and some 50 billion barrels (7.9 billion cubic metres) of natural gas condensates.

This gas field covers an area of 9,700 square kilometres (3,700 sq mi), of which 3,700 square kilometres (1,400 sq mi) (South Pars) is in Iranian territorial waters and 6,000 square kilometres (2,300 sq mi) (North Dome) is in Qatari territorial waters.

The South Pars Field was discovered in 1990 by National Iranian Oil Company (NIOC). The Pars Oil and Gas Company. a subsidiary of NIOC, has jurisdiction over all South Pars-related projects. Field development has been delayed by various problems - technical (i.e., high levels of mercaptans and foul-smelling sulfur compounds), contractual issues and, recently, politics.

NIOC is planning to develop the field in 24 to 30 phases, capable of producing about 25 billion cubic feet (710 million cubic metres) to 30 billion cubic feet (850 million cubic metres) of natural gas per day. Each standard phase is defined for daily production of 1 billion cubic feet (28 million cubic metres) of natural gas, convert|40,000|oilbbl of condensate, 1500 tonnes of liquefied petroleum gas (LPG) and 200 tonnes of sulfur, however some phases have some different production plans.

By the beginning of 2008, phases 1, 2, 3, 4 and 5 have been brought to production and by the end of 2008, phases 6, 7, 8, 9 and 10 will be on stream. Phases 12, 15, 16, 17, 18, 19, 27 and 28 are under different development stages.

South Pars Gas Field

Development Phases 9&10

naft naft naft naft naft Status: Delivered | Year: 2010

Owner: Pars Oil & Gas Company (POGC)
Contractor: Joint venture of GS E&C and O.I.E.C.
Consulting: E.I.E.D.
Location: Assaluye, Iran
Vendor: Parstableau
My Position: Electrical Engineer
My Task: Supplying Bus duct, MV & LV Switchgear

The South Pars field is a natural gas condensate field located in the Persian Gulf. It is the world's largest gas field, shared between Iran and Qatar. According to the International Energy Agency (IEA), the field holds an estimated 1,800 trillion cubic feet (51 trillion cubic metres) of in-situ natural gas and some 50 billion barrels (7.9 billion cubic metres) of natural gas condensates.

This gas field covers an area of 9,700 square kilometres (3,700 sq mi), of which 3,700 square kilometres (1,400 sq mi) (South Pars) is in Iranian territorial waters and 6,000 square kilometres (2,300 sq mi) (North Dome) is in Qatari territorial waters.

The South Pars Field was discovered in 1990 by National Iranian Oil Company (NIOC). The Pars Oil and Gas Company. a subsidiary of NIOC, has jurisdiction over all South Pars-related projects. Field development has been delayed by various problems - technical (i.e., high levels of mercaptans and foul-smelling sulfur compounds), contractual issues and, recently, politics.

NIOC is planning to develop the field in 24 to 30 phases, capable of producing about 25 billion cubic feet (710 million cubic metres) to 30 billion cubic feet (850 million cubic metres) of natural gas per day. Each standard phase is defined for daily production of 1 billion cubic feet (28 million cubic metres) of natural gas, convert|40,000|oilbbl of condensate, 1500 tonnes of liquefied petroleum gas (LPG) and 200 tonnes of sulfur, however some phases have some different production plans.

By the beginning of 2008, phases 1, 2, 3, 4 and 5 have been brought to production and by the end of 2008, phases 6, 7, 8, 9 and 10 will be on stream. Phases 12, 15, 16, 17, 18, 19, 27 and 28 are under different development stages.

Bandar-Abbas Refinery

Gasoline Production Expansion Project

naft naft naft Status: Delivered | Year: 2015

Owner: National Iranian Oil Engineering & Construction (NIOEC)
Contractor: Petrochemical Industries Design & Engineering (PIDEC)
Location: Bandar Abbas, Iran
Vendor: Parstableau
My Position: Project Manager
My Task: Supplying MV Switchgear

Installing New Process, Utility and Offsite Units in the existing Bandar Abbas Refinery in order to increase premium gasoline output and upgrade diesel fuel capacity.
The main new units are as follows:
25,000 bpsd Heavy Naphtha Hydrotreater
16,000 bpsd Light Naphtha Hydrotreater
25,000 bpsd Catalytic Reformer (CCR)
50,000 bpsd Gasoil HDT Unit
110 ton/day Sulfur Recovery Unit
200 ton/day Amine Gas Treating Unit
1800 ton/day Sour Water Stripping Unit
15 different size storage tanks for intermediate or finished products

Strategic Crude Oil Storage Tanks

Umidieh

naft naft naft naft Status: Delivered | Year: 2012

Owner: Petroleum Engineering & Development (PEDEC)
Contractor: Omrab Company
Consulting: Scetiran Engineering
Location: Umidieh, Ahwaz, Iran
Vendor: Parstableau
My Position: Project Manager
My Task: Supplying MV & LV Switchgear

Shiraz 3rd Ammonia & Urea Complex

Power Utility Plant

naft naft naft Status: Delivered | Year: 2013

Owner: Petrochemical Industries Development & Management (PIDMCO)
Contractor: Hirbodan Co. (HICO)
Location: Shiraz, Iran
Vendor: Parstableau
My Position: Project Manager
My Task: Supplying MV Switchgear

Tehran Water Treatment

7th Water Treatment Plant

naft naft naft naft Status: Delivered | Year: 2014

Owner: Tehran city water & wastewater Co. (ABFA)
Contractor: Omrab Co.
Consulting: IranAb Engineering
Location: Tehran, Iran
Vendor: Parstableau
My Position: Project Manager
My Task: Supplying MV & LV Switchgear